Search Results

263

Spot shoring. Base plate missing from jack, only one upright shown....

334

No eye protection...

85

Uncontrolled dust/silica exposure for operator and any workers in the immediate area. Engineering controls not being used to reduce exposure levels. W...

179

Pouring concrete, guard rails incomplete, no midrails or toe boards. At least one worker on bridge pier has no shirt on. Concrete hopper may be direct...

217

Trench box, unprotected leading edges along excavation. Workers without shirt or hard hat on site. Everyone on the site should use proper PPE, workers...

266

No traffic control device and/or flagger in view. Workers should be using class two safety vests. No one in the photo is watching for oncoming traffic...

340

Traffic work zone safety sign. If used at night, cones must have appropriately sized retroreflective bands or be equipped with a light....

61

Eye protection....

86

Photograph of a worker in an awkward posture while using a drill on a concrete deck. Worker should be wearing eye protection and hearing protection. T...

114

Crane lifting bridge section. Workers should never put themselves in a position to be below the load....