Search Results

241

Crane mast maintenance or repair. Both workers tied off and using full body harnesses....

242

Crane mast maintenance or repair. Both workers tied off and using full body harnesses....

302

Cutting up large steel vessel with oxyacetylene torches. Workers may be exposed to lead based paint. Potential slip/fall hazard for one of the workers...

243

Crane mast maintenance or repair. Worker is tied off....

244

Crane mast maintenance or repair, 100% tie off....

411

Iron worker connector, not using a harness. 1926.760(b)(3) connectors shall be provided, at heights over 15 and up to 30 feet above a lower level...

254

Float used for welding, no fall protection. NO protection from welding slag....

421

Crane lift with spreader bar...

265

Installing rebar mat prior to pouring concrete....

42

Steel floor support columns. Picture of pre-pour floor layout....