Search Results

129

Crane load test, one lifting strop appear to be hanging loose. No guard rails on leading edge....

194

Knuckle boom/articulated crane delivering dry wall. Scaffolding not fully planked, no toe boards or screen to protect workers, members of the public b...

223

Mobile crane lifting materials...

288

Should use appropriate open-end wrench or ratchet type tool to tighten up wire rope clamp....

133

Crane with counterweight swing area marked off with caution flags. Designated area may not be large enough to accomodate counterweight....

196

Tower crane...

229

Materials hoist gate....

Preventing Worker Injuries and Deaths from Mobile Crane Tip-Over, Boom Collapse, and Uncontrolled Hoisted Loads

NIOSH Alert outlining the hazard and steps workers should take to protect themselves and others when operating mobile cranes....

ACCSH 1994-4, exh 8, Engineering Work Group Final Report

ACCSH Engineering Workgroup report and recommendations for OSHA Work Group on their review of construction standards to determine where Competent Pers...

ACCSH 1995-2, exh 11C, Steel Erection Negotiated Rulemaking Advisory Committee (SENRAC)

ACCSH Steel Erection Negotiated Rulemaking Advisory Committee report and recommendations for OSHA, including site-specific plan, etc. Part of a collec...