Search Results

169

Material hoist with secured loading ramp in place....

187

Pouring concrete for bridge pier, top rail, midrail in place no toe boards or screen to protect workers below. Worker should try to not position himse...

204

Bull dozer operator not wearing hard hat. Crane working near unsupported edge of excavation....

222

Crane lifting personnel basket...

240

Crane mast maintenance or repair. No apparent fall protection...

262

Workers pushing concrete buggies along walkways. Employer should investigate mechanical means to reduce musculoskeletal stress. Workers should have ey...

276

Cranes/Hoists...

294

Heavy equipment, operator exposure to diesel exhaust....

304

Excavation site...

314

Hazardous waste worker wearing level C protective clothing operating a bull dozer at a hazardous waste site....