Search Results

123

Drilling, crane....

139

Tower crane...

166

Job built stairs with handrails....

183

Concrete pumping truck positioned too close to potential overhead power line. Outriggers extended....

200

Scaffolding around capital building, fully planked....

218

Mobile crane, wire rope with crimped eye splice over metal thimble attached to shackle....

236

Fork lift delivering materials....

258

Crane whip line, headache ball safety latch on crane hook....

272

Worker has eye protection and foot protection. Worker is not using respiratory protection. There are no visible engineering controls to reduce silica...

289

For any excavation greater than 5ft, workers must be protected from cave-ins by an adequately designed protective system e.g. shoring, shielding, slop...