Pouring concrete for bridge pier, top rail, midrail in place no toe boards or screen to protect workers below. Worker should try to not position himse...
Mobile crane mast....
Crane personnel basket. Bridle should be connected to master link....
Unsteady load, wheel barrel not designed for lifting a load....
Concrete form work. Workers using buggy to manually transport concrete. employer should investigate mechanical means to reduce ergonomic work load....
Lifting steel with spreader bar, no fall protection for workers on top of girder....
Masons scaffold, no guard rails evident. Potential overloading of scaffold....
Demolition-trash chute. 1926.852 (d) When operations are not in progress, the area surrounding the discharge end of a chute shall be securely closed o...
Electrical socket with cover...
Scaffolding, fixed ladders....