Search Results

169

Material hoist with secured loading ramp in place....

187

Pouring concrete for bridge pier, top rail, midrail in place no toe boards or screen to protect workers below. Worker should try to not position himse...

203

Mobile crane mast....

221

Crane personnel basket. Bridle should be connected to master link....

239

Unsteady load, wheel barrel not designed for lifting a load....

262

Workers pushing concrete buggies along walkways. Employer should investigate mechanical means to reduce musculoskeletal stress. Workers should have ey...

276

Cranes/Hoists...

294

Heavy equipment, operator exposure to diesel exhaust....

304

Excavation site...

314

Hazardous waste worker wearing level C protective clothing operating a bull dozer at a hazardous waste site....