Material hoist with secured loading ramp in place....
Pouring concrete for bridge pier, top rail, midrail in place no toe boards or screen to protect workers below. Worker should try to not position himse...
Mobile crane mast....
Crane personnel basket. Bridle should be connected to master link....
Unsteady load, wheel barrel not designed for lifting a load....
Workers pushing concrete buggies along walkways. Employer should investigate mechanical means to reduce musculoskeletal stress. Workers should have ey...
Cranes/Hoists...
Heavy equipment, operator exposure to diesel exhaust....
Excavation site...
Hazardous waste worker wearing level C protective clothing operating a bull dozer at a hazardous waste site....