Search Results

183

Concrete pumping truck positioned too close to potential overhead power line. Outriggers extended....

200

Scaffolding around capital building, fully planked....

218

Mobile crane, wire rope with crimped eye splice over metal thimble attached to shackle....

236

Fork lift delivering materials....

258

Crane whip line, headache ball safety latch on crane hook....

272

Worker has eye protection and foot protection. Worker is not using respiratory protection. There are no visible engineering controls to reduce silica...

289

For any excavation greater than 5ft, workers must be protected from cave-ins by an adequately designed protective system e.g. shoring, shielding, slop...

214

214

383

Electrical breaker box should be kept closed. Area around breaker box should be kept clean and free from clutter....

426

Blanking device at flange in pipeline. Solid circle of metal is inserted into flange when the pipeline needs to be blocked for downstream maintenance...