Incorrect scaffolding. Medium-duty scaffold overloaded. Crossbars are too high to be used as guardrails. Boards are extended too far over supports. Pl...
Se trata de una herramienta de entrenamiento para aumentar la conciencia de los peligros y medidas de protección al responder a las secuelas de un hu...
Competent person should supervise dismantling and erection of scaffolding. Workers have no fall protection, incomplete planking, overloading, unguarde...
All workers on site should be using proper PPE. Workers and supervisors should attempt to keep site clear of clutter. Electrical cords should be kept...
Brick mason should be wearing gloves, eye protection. Some workers handling wet cement can develop dermatitis. Work materials should be placed where t...
Worker operating the saw needs; face shield and eye protection, hard hat and correct respiratory protection. Water or vacuum not being used to reduce...
There is no dust suppression system(water, local exhaust ventilation system), electrical connection should have GFCI. Brick mason should be using res...
Worker mixing mortar may need respiratory protection. Scaffolding not fully planked. Scaffold also needs additional cross bracing....
Brick cutting, bad housekeeping too much debris in area. No GFCI on electrical cord, T-pole not secured....
Respirator, silica exposure. Whenever possible, reduce exposure levels through the use of engineering controls such as water spray attachments or...