Search Results

242

Crane mast maintenance or repair. Both workers tied off and using full body harnesses....

113

Crane/Hoist...

138

Crane with outriggers set in place, counterweight swing area guarded by caution flags. Lumber and other debris around crane, potential trip hazard....

205

Mobile crane lifting prefabricated concrete section; workers should not position themselves beneath the load....

243

Crane mast maintenance or repair. Worker is tied off....

407

Two point (Swing stage) scaffold-1/2 in drill hoist...

114

Crane lifting bridge section. Workers should never put themselves in a position to be below the load....

139

Tower crane...

206

Crane

244

Crane mast maintenance or repair, 100% tie off....