Material hoist with secured loading ramp in place....

187

Pouring concrete for bridge pier, top rail, midrail in place no toe boards or screen to protect workers below. Worker should try to not position himse...

203

Mobile crane mast....

221

Crane personnel basket. Bridle should be connected to master link....

239

Unsteady load, wheel barrel not designed for lifting a load....

261

Concrete form work. Workers using buggy to manually transport concrete. employer should investigate mechanical means to reduce ergonomic work load....

275

Lifting steel with spreader bar, no fall protection for workers on top of girder....

292

Masons scaffold, no guard rails evident. Potential overloading of scaffold....

303

Demolition-trash chute. 1926.852 (d) When operations are not in progress, the area surrounding the discharge end of a chute shall be securely closed o...

388

Electrical socket with cover...