1266
Good Practice
This image shows an example of a safe work practice.
Summary Statement
Construction in Southern Alaska in winter. The building is encased in plastic and heated on the inside. Temperature on the outside was
10° F on the inside 60° F.
Weather Conditions, Images
John Rekus/NIOSH
i001266